The main cellar area of the Vineyard, 1-3 Grey Street, Newcastle upon Tyne. As with most underground spaces the cellar had suffered from the effects of water ingress and as such was considered an unusable space. The fundamental aim of the project was to therefore provide a dry storage area by installing a cavity drain system to all vaulted ceilings, walls and floors.

However, before such works could be carried out substantial enabling repairs were required to address the apparent structural problems the building had experienced. It was apparent that a previous attempt of waterproofing had been carried out however, there was no evidence to suggest that a drainage system had been installed which is believed to be at the source of the system’s failure.

The works were carried out over a five week period by an average of three men.