Projects

Saville Row

Pre-cast concrete panels to these retail outlets were deteriorating due to the high porosity of the concrete. Rainwater penetration had caused the steel reinforcement to corrode and large pieces of concrete were at risk of falling.

This project was added to our site on 15 September 2003 and is currently filed under .