Novabrik FAQ's
We’re on hand to provide you with an introduction to the key phrases and basic principles that underpin our range of novabrik services. We hope that our list of frequently asked questions will help make the process of considering a Novabrik transformation a little easier.
- Why use Novabrik instead of traditional brickwork?
- Traditional brickwork involves a greater material and labour content and is subject to weather conditions and operatives skill level. Novabrik is not affected by these drawbacks as it is an interlocking cladding which can be installed throughout the year due to no drying time requirements. Installation time is dramatically reduced and minimal site debris is a major advantage to safer operational sites.
- From a maintenance point of view, how easy is it to damage and repair?
- At our seminars we encourage attendees to try and destroy sections of Novabrik on a separate display board which eventually will give after great effort on the participant’s part. Once the brick has been broken we demonstrate how easy it is to fully repair the area which takes approximately ten minutes with attendee’s unable to identify the repaired area.
- Where would I use Novabrik?
- Novabrik can be used anywhere that traditional brickwork would be used. It is used in new domestic timber frame dwellings, refurbishments, School developments, commercial buildings and all from low rise to medium rise constructions.
This page belongs to our Novabrik Systems section.