Blog: Industrial & Civil

Keith Barrasford – P.E.T Project Co-ordinator (Refresco), Alan Keeley – Contracts Manager (St Astier), Eric Francis – Engineering Co-ordinator (Refresco)

Refresco Refurbishment

Posted on 7 July 2010 by Alan Keeley

We have recently completed a major refurbishment contract for Refresco, the beverages and soft drinks producer in Durham. The refurbishment scheme, which began in spring 2010, principally involved enabling works prior to the installation of...

Keep Reading...

Bottling operations at Refresco

Industrial Flooring Works

Posted on 26 May 2010 by Alan Keeley

A 10,000sqm storage area at Refresco’s Belmont Estate site is being transformed in line with exacting, food hygiene standards and includes the installation of the company’s first aseptic, PET production line in the UK....

Keep Reading...

Bridge 22

Bridge Twenty Two

Posted on 11 September 2009 by Alan Keeley

St Astier operatives are working with Volker Rail staff at bridge number 22 which provides essential rail links to the city docks at Kingston upon Hull. We will be sealing gaps between packers after the...

Keep Reading...

External photograph of the Red Quadrant at the MetroCentre

MetroCentre Concrete Screeding

Posted on 2 March 2009 by Phil Brown

St Astier begins work today to repair and replace concrete slabs in the MetroCentre’s Yellow Quadrant – one of the original sections of the iconic development, built in 1988.

The work is part of the previously...

Keep Reading...

roadmap showing part of the A69 Road

A69 Works Continue

Posted on 8 December 2008 by Phil Brown

The preceding six months has seen St Astier completing varying concrete repair & protection projects to five bridges spanning the A69 – a major route linking the North East of England with the North West...

Keep Reading...

Older

back to the main Blog